Product Code: 4113
Manufacturer Ref: 5WG13735EY01
Manufacturer: Siemens
Price: £422.23

REG 373 16-channel annual time switch with DCF-77 connection
with 500 switching times for selectable daily, weekly and date
commands, pulse commands, priority switching times, and
1x switching operation for holiday/public holidays, with normal
weekly program definable per channel and up to nine further
weekly programs with priority levels P1 to P9, with random
program that can be activated for each channel, with astro
program for channels 1 to 4, with 99-day holiday program,
adjustable for 99 days in advance, with maintaining of switching
time settings for up to 10 years in the event of power failure, with
automatic calculation of moving bank holidays for the respective
year, with automatic daylight saving clock adjustment, with
automatic time and date synchronization over DCF-77, with
effectiveness of the DCF-77 aerial within a range of 1000 km
around Frankfurt, with sending of time and date over the bus,
with sending of switching, positively driven, dimming and transmit
value telegrams, temperature and HVA operating mode
telegrams, with 8 scenes for 6 scene objects with selectable
telegram types (switching, positively driven operation, transmit
value, temperature, HVA operating mode), with cyclic sending of
telegrams, with 1 scene with up to four different telegrams, with
temporary or permanent manual switching operation, with
programming over PC using the memory module OBELISK, with
15 jog pushbuttons for setting weekday, hour, minute, time of day,
program input and 4 manual switching operations, with LCD for
time of day, weekday, summer/winter time, holiday program,
switching state of 16 channels, manual switching operation, with
integrated power supply for 230 V AC for powering the AP 390
DCF-77 aerial with 29 V DC, with bus-powered electronics, with
integrated bus coupling unit, bus connection over bus terminal,
for mounting on DIN rail EN 60715-TH35-7.5.
During configuration of the 16-channel annual time switch, the
installation engineer must carry out all the necessary settings.
Width 6 MW (1 MW = 18 mm)

